We are moving rapidly toward full season now with just a couple of weeks to go before we begin regular service to the Notch. We have already operated our first train to Crawford Station which was a charter for a Canadian tour group. This means that we had to have the Crawford Notch Line between […]

May 2014

We managed to get both the Bartlett and the Conway lines open in time for our opening day which was April 12 this year, but it was a struggle.  We called upon the services of the Bartlett Snowmobile club and asked them to use their groomer to open the line between Albany Ave in Bartlett […]

March 2014

We are eagerly looking forward to opening day which is rapidly approaching!  Over at the Roundhouse, the very last work on the new concrete floor has just taken place, and we are calling that project complete.    It really is a different building now, kind of like going from a barn with a dirt floor to […]

February 2014

We are having a real old fashioned New England winter this year, just like I remember when I was a kid! It’s been very cold with the temperatures down below zero many nights with lots of snow and ice. It’s not the kind of weather you want for taking a scenic train ride. It is, […]

January 2014

We started off the New Year right with our seventh annual Steam in the Snow excursion that ran to Notchland on Saturday, January 4th.  There were well over 300 fans aboard for the five hour trip which was sponsored by the Massachusetts Bay Railroad Enthusiasts.  Temperatures were frigid on the night before the trip and […]

December 2013

It hardly seems possible that December is here again already! At this writing we have already operated several “Santa’s Holiday Express” and “Polar Express™” trains for good-sized crowds with more to come right through the end of the month.

Over at the Roundhouse, we are engaged in a big project! The original 1874 Roundhouse floor, constructed […]

November 2013

The fall foliage season has come to a close, and it was a good one this year with many eight car trains filled with passengers leaving the station for a ride through Crawford Notch and beyond to Fabyans.  We have dropped back now to weekend service only, where the 11:30 train to Bartlett and the […]

October 2013

Ridership was off to a bit of a slow start in September this year, but with the turning of the leaves into vibrant reds, yellows and oranges, business has really picked up.  We have recently been running 8 cars on the Notch Train and 6 cars on the Valley Train.  I always like this time […]

September 2013

We have begun to experience some cool nights here in the mountains which can only mean that Fall is on the way, and with Fall comes foliage and our busiest time of the year.

Our track crew has been working hard over the course of the summer.  They have just completed the work of rebuilding the […]

August 2013

Thomas the Tank Engine has come and gone now until next year.  We ran 54 round trip trains with our little blue friend over the course of two weekends, and a good time was had by all!
We have settled in to our regular schedule of trains.  We offer at least 5 departures every day with […]

July 2013

THOMAS is here!  He arrived on a tractor trailer during the last week of June and is currently resting up in the Roundhouse for the work he has to do, pulling our July Thomas trains.

Our regular Valley Train engine, GP7 #573, took a break from working the train during the last week of June so […]

June 2013

We recently made up the summer Valley Train, which is to say that the Notch Train cars are now off the train and the Valley red cars are on.  We just finished up some work on open car #1557 including roof work and touch up painting which allowed us to put it in the consist […]

May 2013

As I write this, Hy-Rail truck #204 has just traveled through the Gateway in Crawford Notch headed west to the end of our line at Hazen in Whitefield, NH.  This is the very first move of the year west of Bartlett, and they have been cutting fallen trees and removing boulders from the tracks as […]

April 2013

We are just about ready to start the 2013 operating season!

GP7 #573 has just come out of the shop after receiving four new power assemblies and a new oil pump.  In addition, the locomotive had a 92-day FRA inspection and had her annual air brake maintenance done.  Also while she was in the shop, we […]

March 2013

Opening day is less than six weeks away, and we are all looking forward to being up and running again!

The roundhouse crew has just completed work on GP38 #252, and it is now out of stall one.  #252 had a complete 92-day inspection done, and her one year air brake items were attended to.  We […]